Procedures
Getting a Price:
Fax (510) 475-9547 a drawing (floor
plan) with any special situations noted. Countertops
by Crown will call, mail, or fax back a written proposal good for 30
days.
Measuring:
Once our bid has been accepted, we need to take measurements of
your cabinets. The cabinets should be installed true and level so we can take
accurate measurements to insure a proper fit. Style and color must be chosen.
Your sink and range information is required at this time. Have the brand and
model number of the sink and range or have them physically on site for
inspection.
Schedule:
Our schedule from the time of measurements are taken to
installation is approximately two weeks. This could vary depending on the color
selected. We will coordinate an installation date and approximately three days
prior to installation.
Date of Installation:
Old countertops and appliances must be removed.
Sinks should not be installed until after the countertop installation.
All exposed dishes, pots and pans, etc, that are exposed from the top of
the cabinets should be removed prior to installation. The tops are scribed and
cut to fit the wall and secured to the cabinets.
We seal the top of the backsplash with a silicone caulk against the wall.
Cut outs to complete the range or sink may be required to insure a proper
fit of the countertops, so expect some dust. The installation of sinks and
appliances are not part of our work, this must be done by other specialists.
Terms:
Our terms (unless you have
already set up an account) require a 50% deposit at the time the
measurements are taken. The balance is due upon installation.
Return to Products |